Case Studies: Design & New Build

Newbuild Cottage, Trellech

Building new is often cheaper and quicker than restoring an older property – but not so this stunning cottage in Trellech.

It replaced a derelict stone cottage at the end of a narrow lane.  It was the lane which presented the problem.  It was too narrow to get a construction lorry down.

This meant that everything needed for the project had to be small enough to be brought to site on a transit-size tipper and the structure had to be hand-made in timber before being insulated, rendered and covered in wood and natural slate.

But we did it – in less than 12 months.

Contact Us